In relocating its European headquarters into a city centre, Unilever sought our assistance with technical aspects of the building – mechanical and electrical installations, acoustics and fire safety. Adjustments were needed to accommodate four large kitchens which made unusual demands on power and water supplies and the air handling units.
To meet the tight time schedule, we created a schematic technical design in a very short time, at which point a contractor was appointed to work in parallel with the design process. However, with cost estimations exceeding budget, the project required value engineering. Drawing on our considerable experience, we brought together all parties including our client, the contractor, architect and civil engineer to value engineer the project and find the necessary savings in a single meeting.